The installation of the bus duct

時間:22-10-14
Insert box and its installation:
1. The shell of the socket is anticorrosive steel, and the surface is sprayed with epoxy resin electrostatic powder, so that it can be used in the corrosive environment.
2, the socket box adopts the circuit breaker type, the circuit breaker is operated in the socket box, and the protective plate must be installed in the box so as to avoid the electric shock during the use of the circuit breaker.
3. The door of the socket should have a interlocking device to prevent it from opening the valve in the charged state and causing unnecessary loss.
4. The lock foot of the socket should have interlocking function to ensure that the socket can be completely inserted in the rear.
5. When the case of the socket is PE, a special PE row is built in the socket to ensure the ability of grounding short circuit.
6, before the installation of busbar slot box, we must open the safety baffle at the slot of the busbar slot. We should first push the switch inside the box to the position of the OFF disconnection, insert the socket pin into the busbar slot from the bus slot socket according to the phase sequence, and ensure that the insertion is in place. It is strictly prohibited to plug in the case of no power off, so as not to touch electricity.
8. After the installation of the box is completed, the two claw type chuck should be fixed to both sides of the busbar slot and tighten the screw tightly.
The installation of the busbar and its bracket:
1. The reformed busbar groove must reach the 3C certification standard. The newly added socket should have a 3C certification mark and indicate its specific detection mark.
2. The surge voltage of the busbar slots must meet the requirements of the current national standards. The protection grade of the shell is not less than IP54.
3, the installation of busbar support must be required. When the busbar is laid horizontally, each unit busbar should not be less than two stents, and it should be reliable and fixed, and the support and busbar slot should be tightly connected.
4, when installing the bus slot body, the insulation resistance of each bus bar slot, phase to phase, phase zero and zero ground must be measured before installation, and the insulation resistance should not be less than 20M ohm. The bar slot in the horizontal installation should use the press plate to fix the busbar slot on the support of the busbar slot, and the fixed bolt should not be tighten.  After installing one unit busbar, insulation resistance of busbar slot should be measured, allowing total insulation resistance to decrease gradually, but no sudden change is allowed, and the total insulation resistance should not be less than 0.5 M ohm.
Between the box and the busbar should be reliable fixed on the busbar after building settlement joint and expansion joints should be soft connection unit configuration of busbar busbar, after installation should pass through walls and floor of the fire hole plugging.
Two horizontally adjacent busbar grooves; the spacing of the support point should not be greater than 2.5m when the bar groove is laid horizontally. (for example, the large span high-strength bus grooves are laid in the workshop, the spacing can be greater than 6m.) When the busbar slot is installed on the support and hanger, the horizontal fixed pressure plate is fixed.
The connection points of the busbar slot should not be in the wall, and there should be no sewage and sundries entering the busbar when the busbar slot is installed through the wall hole.
After the whole connection of the busbar slot, the grounding resistance must be checked with the 1 Omega gear of the multimeter. The resistance value is less than O. 1 Omega to ensure ground requirements.
The expansion (expansion) section should be set when the length of the busbar line is more than 60m.
CONTACT US
    CONTACT:Manager MA
    MOBILE:+86-18906101377
    FAX:0511-88432267         0511-88435243
    TEL:0511-88431575         0511-88438777
    ADD:Fuyu Industrial Area, Yangzhong City, Jiangsu, China
FOLLOW US

Oneq Group Copyright ? 2012-2013. All rights reserved. Technical Support : Erun 蘇ICP備11004742號-1

The installation of the bus duct

時間:22-10-14  

Insert box and its installation:
1. The shell of the socket is anticorrosive steel, and the surface is sprayed with epoxy resin electrostatic powder, so that it can be used in the corrosive environment.
2, the socket box adopts the circuit breaker type, the circuit breaker is operated in the socket box, and the protective plate must be installed in the box so as to avoid the electric shock during the use of the circuit breaker.
3. The door of the socket should have a interlocking device to prevent it from opening the valve in the charged state and causing unnecessary loss.
4. The lock foot of the socket should have interlocking function to ensure that the socket can be completely inserted in the rear.
5. When the case of the socket is PE, a special PE row is built in the socket to ensure the ability of grounding short circuit.
6, before the installation of busbar slot box, we must open the safety baffle at the slot of the busbar slot. We should first push the switch inside the box to the position of the OFF disconnection, insert the socket pin into the busbar slot from the bus slot socket according to the phase sequence, and ensure that the insertion is in place. It is strictly prohibited to plug in the case of no power off, so as not to touch electricity.
8. After the installation of the box is completed, the two claw type chuck should be fixed to both sides of the busbar slot and tighten the screw tightly.
The installation of the busbar and its bracket:
1. The reformed busbar groove must reach the 3C certification standard. The newly added socket should have a 3C certification mark and indicate its specific detection mark.
2. The surge voltage of the busbar slots must meet the requirements of the current national standards. The protection grade of the shell is not less than IP54.
3, the installation of busbar support must be required. When the busbar is laid horizontally, each unit busbar should not be less than two stents, and it should be reliable and fixed, and the support and busbar slot should be tightly connected.
4, when installing the bus slot body, the insulation resistance of each bus bar slot, phase to phase, phase zero and zero ground must be measured before installation, and the insulation resistance should not be less than 20M ohm. The bar slot in the horizontal installation should use the press plate to fix the busbar slot on the support of the busbar slot, and the fixed bolt should not be tighten.  After installing one unit busbar, insulation resistance of busbar slot should be measured, allowing total insulation resistance to decrease gradually, but no sudden change is allowed, and the total insulation resistance should not be less than 0.5 M ohm.
Between the box and the busbar should be reliable fixed on the busbar after building settlement joint and expansion joints should be soft connection unit configuration of busbar busbar, after installation should pass through walls and floor of the fire hole plugging.
Two horizontally adjacent busbar grooves; the spacing of the support point should not be greater than 2.5m when the bar groove is laid horizontally. (for example, the large span high-strength bus grooves are laid in the workshop, the spacing can be greater than 6m.) When the busbar slot is installed on the support and hanger, the horizontal fixed pressure plate is fixed.
The connection points of the busbar slot should not be in the wall, and there should be no sewage and sundries entering the busbar when the busbar slot is installed through the wall hole.
After the whole connection of the busbar slot, the grounding resistance must be checked with the 1 Omega gear of the multimeter. The resistance value is less than O. 1 Omega to ensure ground requirements.
The expansion (expansion) section should be set when the length of the busbar line is more than 60m.

聯(lián)系我們

  • 地址:江蘇省揚中市豐裕工業(yè)區(qū)

  • 電話:0511-88431575

  • 郵箱:sales@oneq.com.cn

Oneq Group Copyright ? 2012-2013. All rights reserved.
Technical support:Erun
主站蜘蛛池模板: 亚洲三区在线观看无套内射| 国产精品果亚洲av无人一区| 国产自产妇一区二区三区| 成年无码a√片在线观看| 久久久精品中文字幕乱码18| 久久精品国产再热青青青| 性av一区二区三区在线观看| 熟女精品视频一区二区| 日韩国产高清一区二区| 久久人妻国产精品| 久久亚洲精品高潮综合色a片| 久久久亚洲精品一区二区三区| 中文字幕无码中文字幕有码a| 国产av高清无亚洲| h动漫无遮挡成本人h视频| 久久精品国产9久久综合| 麻豆画精品传媒2021一二三区| 免费无码黄网站在线看| 亚洲婷婷综合色香五月| 亚洲综合aⅴ一区二区三区| 亚洲国产成人久久精品软件| 草草久久久无码国产专区| 草草影院发布页| 中文字幕亚洲综合久久菠萝蜜| 东京热男人av天堂| 午夜伦情电午夜伦情电影| 久久九九有精品国产尤物| 亚洲天堂一区三区四区| av天堂午夜精品一区| 国产精品一区二区三区直播| 日韩av一区免费观看| 亚洲国产成人无码影片在线播放| 永久黄网站色视频免费直播| 国产成人片无码视频在线观看| 国产精品久久久久电影院| 国产性天天综合网| 国产色综合久久无码有码| 亚洲av高清一区二区| 性欧美videofree高清极品| 在线看片免费人成视频电影| 亚洲永久无码3d动漫一区|